Project Title: Dry Dock No.3, MMHE, Pasir Gudang, Johor.
Duration: Dec 2019 – Present.
Scope: Engineering, Supply, Installation and Commissioning of File Protection System.
- Fabrication and Installation of FM200 (Gaseous Fire Suppression System).
- Fabrication and Installation of C02 (Gaseous Fire Suppression System).
- Installation of Fire Alarm System.
Project Title: Construction of 132kV Substation, ST Microelectronics, Muar, Johor.
Duration: Jan 2019 – May 2019.
Scope: Engineering, Supply, Installation and Commissioning of File Protection System.
- Fabrication and Installation of FM200 (Gaseous Fire Suppression System).
- Fabrication and Installation of Deluge Water Spray System.
- Installation of Fire Alarm System.
Project Title: Project Refinery & Petrochemical Integrated Development (RAPID), Petronas.
Duration: June 2016 – January 2019.
Scope: Civil & Mechanical Work (Package 4).
- Device Project execution schedule based on design inputs and logic sequence.
- Fabrication & Installation of valve pits, catch basins and manholes.
- Lamination, installation, leak test & commissioning of 8 km AOC Line (GRE Piping).
- Lamination, installation, hydrotest & commissioning of 2 km fire water (GRE Piping).
- Erection & commissioning of Inergen System (Gaseous Fire Suppression System) in substations according to NFPA Standards.
- Erection &commissioning of silo fire sprinkler system according to NFPA Standards.
Fabrication and installation of wet riser system, dry riser system, hydrant system and hose reel according to NFPA Standards.
CLEANING
SERVICING
TESTING
SCI FIRE SERVICES MASTER SDN BHD
CONTACT
HQ:
PLOT 79 & 81, LOT INDUSTRI
TAMAN BATU GAJAH PERDANA,
31550 PUSING, PERAK.
TEL: 05 – 366 6419
FAX: 05 – 366 9791
KL BRANCH:
SUITE 806, LEVEL 8, BLOCK A4, LEISURE COMMERCE SQUARE, JALAN PJS 8/9, 46150 PETALING JAYA, SELANGOR.
PENANG BRANCH:
NO 5, JALAN BAGAN 25, TAMAN BAGAN, 13400 BUTTERWORTH, PULAU PINANG.